Asbestos before demolition in Ontario: the survey, the rules and who does the work

In Ontario, a designated substances survey is required before a construction or demolition project on any building where those substances may be present, and asbestos is the one that turns up most. Any building from before 1990 is the usual trigger. A qualified consultant does the survey, a licensed abatement crew removes what it finds, and demolition continues only after that.

By Breaker Demolition · Published September 12, 2026 · No prices in the guides; every number comes from a site walk. Anything in [brackets] is confirmed before launch.

01

What the law requires

Ontario's Occupational Health and Safety Act requires a designated substances survey before a construction or demolition project on a building where such substances may be present, with the results handed to the contractor before work begins. Asbestos is one of the designated substances. Disturbing it is governed by O. Reg. 278/05, which sets out how asbestos is handled, who may do it and what protection is required.

The regulation sorts asbestos work into three types. Type 1 is low risk work, such as removing a small amount of non-friable material without breaking it. Type 2 is moderate risk, with enclosures and respirators. Type 3 is high risk, which covers most removals of friable material and most larger jobs, with full enclosure, negative air and decontamination. A survey tells you which type applies before anyone touches the material.

02

Why 1990 is the line

Asbestos was in common building products through the 1980s. A house built before 1990 is assumed to possibly contain it, so it gets surveyed. That does not mean a 1975 house is full of asbestos, and it does not mean a 1995 house has none. It means the survey is required for the first and a judgment call for the second. When in doubt, survey.

03

Where it hides in a Toronto house

None of these is a problem sitting still. All of them become a problem when a sledgehammer goes through them, which is the whole point of surveying before demolition rather than after.

  • Vinyl floor tile and the black mastic under it
  • Vermiculite attic insulation, often loose under the batts
  • Pipe and duct insulation, the white wrap on old heating lines
  • Plaster, and the drywall joint compound in houses from the 1960s to the 1980s
  • Textured or stipple ceilings
  • Cement board siding and soffits
  • Roofing felts and some shingles
04

What the survey involves

A qualified consultant walks the building, samples the suspect materials, and sends them to a lab. The report lists each material, whether it contains asbestos, and the work type under O. Reg. 278/05 that removal would need. [Survey cost, Kam confirms.] [Turnaround from site visit to report: n days, Kam confirms.]

If the report is clean, demolition proceeds. If it finds asbestos, the materials are removed by a licensed abatement crew, under the controls the work type requires, and cleared before the strip-out or the tear-down continues. [Whether that crew is ours depends on licensing Kam confirms.] [Abatement cost range, Kam confirms.]

05

What it means for your schedule and your permit

The survey and the demolition permit run in parallel, so order the survey the day you decide to demolish. Abatement, if needed, sits between the survey and the demolition and takes its own days on the calendar. On a pre-1990 house the survey report is part of the file the contractor works from, and no strip-out on an older house starts without it.

06

What to do now

If your house predates 1990, tell us the year built and what is coming out. We tell you whether a survey is required and what the report needs to cover. Book a site walk and you get the survey sequenced into the schedule, before the bin arrives.

Questions people ask next

If the house was built before 1990, yes. A strip-out is a construction project under the Act, and the survey is required before it starts, permit or no permit.

Ontario's rules apply to workplaces, and a contractor cannot touch it without following O. Reg. 278/05. For a homeowner the practical answer is the same: have it surveyed and, if it contains asbestos, have a licensed crew remove it.

Work stops in that area, the material is sampled, and if it contains asbestos a licensed crew removes it before work resumes. This is the expensive version of the survey, which is why the survey comes first.

Not automatically. Pre-1990 is the usual trigger. Some products lingered past that date, so a consultant may still recommend sampling specific materials.

The owner, and a copy goes to every contractor working on the project. Keep it with the permit file.

We tell you which permit applies at the site walk.