How long does demolition take?

A basement or kitchen strip-out takes about three days. A house structure comes down in about a day once permits and utility disconnects are done, with the foundation out and the hole backfilled within the week on a typical lot [Kam confirms]. The demolition itself is fast. The permit and disconnect wait in front of it is the real schedule.

By Breaker Demolition · Published September 12, 2026 · No prices in the guides; every number comes from a site walk. Anything in [brackets] is confirmed before launch.

01

The three day strip-out

A typical basement or kitchen strip-out runs three days, typical for a [n] sq ft basement; Kam confirms. The days break down the same way every time.

  • Day one: contain and disconnect. Dust walls go up, the return air gets sealed, and plumbing and electrical in the work area are capped.
  • Day two: strip to the studs. Drywall or plaster, ceiling, flooring, cabinets, fixtures. Everything goes into the bin the same day it comes off the wall.
  • Day three: sweep and sign off. Nails pulled, floors swept, the bin picked up, and a walk-through with you before the trades come in.
02

Structural work: a wall in a day, an engineer in front of it

Taking out a load-bearing wall is a one or two day job on site: shore, cut, set the beam, remove the shoring. What sits in front of it is the engineer's drawing and the building permit, which is [n] weeks typical, Kam confirms. A bigger structural scope, say a rear addition coming off, runs [n] days on site, Kam confirms.

Plaster and lath add time to any of this. A basement reached only through the house adds time. Neither usually turns three days into a week.

03

Full tear-down: a day to drop, a week to clear

Once the permit is issued and gas, hydro and water are disconnected, the house comes down in about a day. Sorting and loading the debris takes another day or two depending on bin turnaround. Then the foundation is broken, pulled and hauled, and the hole is backfilled. On a typical lot the site is clear within the week [Kam confirms].

The wait in front of that week is where the calendar goes. Demolition control review, permit issuance and utility disconnect bookings each have their own lead time, and they overlap only partly. [Typical wait from application to demolition day: n weeks, Kam confirms.]

04

Pools and garages

A pool removal depends on whether the shell comes out entirely or gets broken up and buried in place. [Full removal: n days; partial removal: n days, Kam confirms.] A detached garage is typically down and gone in a day, with the slab out the same day or the next [Kam confirms]. Both need a permit, and a pool needs Ontario One Call locates before the excavator arrives.

05

What stretches the timeline

Six things push a demolition date. Most of them sit in front of the job, not inside it.

  • Designated substances survey. Any pre-1990 building gets surveyed before work starts. [Turnaround from site visit to report: n days, Kam confirms.]
  • Abatement. If the survey finds asbestos, a licensed crew removes it under O. Reg. 278/05 before demolition continues. That is its own scope with its own days.
  • Permit. Nothing structural moves until Toronto Building issues it, and demolition control on a house adds review time.
  • Weather. Frozen ground slows a foundation pull. Rain turns a backfill into mud. Wind stops a high-reach machine.
  • Access. A street bin needs a City street occupation permit, and a house with no driveway means hand carry to the curb.
  • Surprises. A second layer of floor, a buried oil tank, a foundation thicker than the drawing. Each adds a day, rarely more.
06

How to plan around it

Order the survey the day you decide to demolish. Start the permit before you hire anyone. Book a site walk and you get a day by day schedule for your job, with the waits marked as waits.

Questions people ask next

About three days: contain and disconnect, strip to the studs, sweep and sign off. A kitchen with plaster walls or a tile floor on a mortar bed can run a day longer.

About a day for the structure, with the foundation out and backfilled within the week on a typical lot [Kam confirms]. The permit and disconnect wait before that is [n] weeks typical, Kam confirms.

Not on anything structural. A non-structural interior strip-out usually can, since it needs no demolition permit of its own.

It slows it. Interior strip-outs run year round. Foundation pulls and backfill are slower in frozen ground, and some days are lost to wind or snow.

If the survey is clean, as soon as the report is in hand. If it finds asbestos, abatement comes first, and that scope is scheduled on its own.

We tell you which permit applies at the site walk.