Basement demolition.

Most basement demolition is undoing somebody's weekend. Panelling over strapping over foundation, a dropped ceiling hiding the ducts, carpet glued to concrete, a bathroom plumbed without a permit. We take it all back to the slab and the foundation walls, leave the mechanical room untouched, and hand over a basement your contractor or your second-unit designer can actually measure.

What is included

On the ticket.

01

Dust walls at the stair; upstairs floors protected on the route to the bin

02

Water and power isolated by licensed trades; old bathroom plumbing capped

03

Framing, drywall, panelling, insulation, dropped ceilings and flooring out

04

Old bathrooms, bars, closets and built-ins removed

05

Furnace, water heater, panel and services left in place and protected

06

Slab and foundation walls swept clean and photographed at handover

What sets the price here

Lines, not guesses.

DriverWhat we look at
Floor areaSquare footage going back to concrete.
Finishes and how it was builtPlaster, tile and framed-over ductwork slow the strip.
AccessA walk-out with a driveway beside it is one job; a narrow stair through the kitchen is another.
Bins and tippingBin count by weight.
Permit and utility locatesWhether a permit applies and whether we book the locates.

The number comes from a site walk. Concrete cutting for a new entrance and underpinning are quoted separately.

Permits notes

Paper first.

  • A non-structural basement strip-out usually needs no permit. The finish or second unit that follows does.
  • Cutting a new side entrance through the foundation, or lowering the floor, is structural: permit, engineer and a separate quote.
  • Pre-1990 houses: vermiculite insulation, floor tile and duct tape can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

Questions about basement demolition

For a non-structural strip-out, usually no. The finish that follows, and any second unit, needs a building permit. Any wall that carries load needs a permit before it comes out.

Three days on a typical basement: contain and disconnect, strip to concrete, sweep and sign off. [Kam confirms for a [n] sq ft basement.]

Yes, always, unless you tell us otherwise. Mechanical equipment, the panel and the services stay in place and get protected.

Cutting a foundation wall is structural work under permit with an engineer's detail. [Kam confirms whether Breaker does the cut or the strip-out only.]

Usually glue and sometimes tile. In a pre-1990 house that tile can contain asbestos, which the survey identifies before we lift it.

Lock a number at the site walk.