Basement demolition in Mississauga

Most basement demolition is undoing a previous owner's weekend, back to the slab and the foundation walls. Tear-downs in Mineola, Lorne Park and Port Credit, and basement, kitchen and garage work everywhere else.

Basement demolition · Mississauga

Mississauga, on the ground.

South Mississauga is 1950s and 1960s houses on 60 to 100 foot lots that builders replace; the northern subdivisions are 1980s and 1990s homes owners renovate. That tells us how much of what we will find is drywall and truss and how much is panelling, plaster and glued-down tile. Wide lots south of the QEW take a full excavator and two bins at once; the newer subdivisions have double driveways that hold a bin easily. The stair is sealed, upstairs floors are protected, and framing, ceilings and flooring go out to a 20 yard bin while the furnace and panel stay untouched.

Read more about demolition in Mississauga or the full basement demolition service page.

What is included

On the ticket.

01

Dust walls at the stair; upstairs floors protected on the route to the bin

02

Water and power isolated by licensed trades; old bathroom plumbing capped

03

Framing, drywall, panelling, insulation, dropped ceilings and flooring out

04

Old bathrooms, bars, closets and built-ins removed

05

Furnace, water heater, panel and services left in place and protected

06

Slab and foundation walls swept clean and photographed at handover

Permits in Mississauga

Paper first.

A non-structural basement strip-out usually needs no permit; the finish or second unit that follows does, and a new foundation cut needs an engineer. The City of Mississauga issues the permit; Peel Region is the upper tier and does not.

  • A non-structural basement strip-out usually needs no permit. The finish or second unit that follows does.
  • Cutting a new side entrance through the foundation, or lowering the floor, is structural: permit, engineer and a separate quote.
  • Pre-1990 houses: vermiculite insulation, floor tile and duct tape can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Mississauga
DriverWhat we look at
Floor areaSquare footage going back to concrete.
Finishes and how it was builtPlaster, tile and framed-over ductwork slow the strip.
AccessA walk-out with a driveway beside it is one job; a narrow stair through the kitchen is another.
Bins and tippingBin count by weight.
Permit and utility locatesWhether a permit applies and whether we book the locates.

The number comes from a site walk. Concrete cutting for a new entrance and underpinning are quoted separately.

Basement demolition questions from Mississauga

Usually not for the strip-out. The finish or second unit that follows needs a permit from the City of Mississauga, and any load-bearing wall needs one before it comes out.

Three days on a typical basement: contain and disconnect, strip to concrete, sweep and sign off. [Kam confirms for a [n] sq ft basement.]

Broken, hauled and crushed for recycling. The hole is backfilled and compacted unless your builder wants it left open for the new footings. Ask us to coordinate that with them.