Asbestos abatement.
Most houses and commercial buildings from before 1990 hold asbestos somewhere: floor tile and the mastic under it, pipe wrap, duct tape, plaster, vermiculite, fireproofing. Ontario requires a designated-substances survey before demolition on those buildings. Breaker coordinates the survey, removes what it finds under O. Reg. 278/05, and then carries straight on with the strip-out or the tear-down. One contractor, one schedule.
On the ticket.
Designated-substances survey coordinated with a qualified consultant, report in hand before work starts
Work type set from the report: Type 1, 2 or 3 under O. Reg. 278/05
Enclosure, negative air and decontamination set up to the work type
Asbestos-containing materials removed, bagged, sealed and labelled
Regulated waste shipped to a licensed disposal site with a manifest, never in a mixed bin
Clearance before the demolition crew comes back in
Lines, not guesses.
| Driver | What we look at |
|---|---|
| What the survey finds | Each material is its own line: tile, mastic, pipe wrap, plaster, vermiculite, fireproofing. |
| Work type | Type 3 friable removals need full enclosure and take longer than a Type 1 tile lift. |
| Area and access | Square footage of the material and how many rooms or floors it runs through. |
| Disposal | Regulated waste travels separately to a licensed site and is weighed there. |
The number comes from the survey report and a site walk. Abatement is its own line on the quote, ahead of the demolition.
Paper first.
- Ontario's Occupational Health and Safety Act requires a designated-substances survey before demolition on any building where those substances may be present. Pre-1990 is the usual trigger.
- Asbestos work follows O. Reg. 278/05, which sets the work type, the controls and who may do it. [Licence details]
- The survey and the demolition permit run in parallel. Abatement sits between them on the calendar.
- Asbestos never rides in a demolition bin. It leaves sealed, labelled and manifested.
The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.
Breaker does it. We coordinate the designated-substances survey, remove what it finds under O. Reg. 278/05, and then the same company carries on with the demolition. You deal with one contractor and one schedule.
Yes. Any building from before 1990 gets a designated-substances survey before demolition. The survey samples suspect materials and a lab confirms what they contain.
It depends on the work type and how much material there is. A small Type 1 removal fits inside a day. A Type 3 removal with enclosure takes its own days on the calendar, and demolition starts after clearance.
No. It is bagged, sealed, labelled and shipped as regulated waste to a licensed disposal site with a manifest. The demolition bins carry everything else.
Work stops in that area, the material is sampled, and if it contains asbestos we remove it before work resumes. The survey exists to stop that from happening.
