10 · Pickering, Durham Region

Bathroom demolition in Pickering

A bathroom is the heaviest room in the house per square foot, and all of it goes down the stairs by hand. South Pickering is 1960s and 1970s houses on generous lots near Frenchman's Bay; the north is newer subdivisions and the new Seaton community. That tells us whether to expect mortar-bed tile and cast iron, or a 1990s acrylic surround that comes out in an hour.

Bathroom demolition · Pickering

Pickering, on the ground.

Quick access to the 401 makes bin swaps fast; waterfront lots can carry conservation authority rules that shape the rebuild. Plumbing is capped by a licensed trade, the door is sealed, and tile, tub, vanity and fixtures leave through a protected hallway to a 10 yard bin.

Read more about demolition in Pickering or the full bathroom demolition service page.

What is included

On the ticket.

01

Water isolated and plumbing capped by a licensed plumber; circuits made safe

02

Dust containment at the door; hallway and stairs protected

03

Tile, tub or shower, vanity, toilet, fixtures and accessories out

04

Walls and ceiling to the studs where the design needs it

05

Floor tile and underlayment lifted; subfloor inspected and reported

06

Debris carried out, bin loaded, room swept; photos at handover

Permits in Pickering

Paper first.

A bathroom strip-out usually needs no permit; the new plumbing and electrical do, under the plumber's and electrician's permits. The City of Pickering issues the permit; Durham Region is the upper tier.

  • Stripping a bathroom is non-structural and usually needs no permit. The plumbing and electrical work in the new bathroom will need one.
  • Moving a drain or a vent stack is plumbing work under permit; we cap in place and leave the rerouting to the plumber.
  • Pre-1990 houses: floor tile, mastic and plaster can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Pickering
DriverWhat we look at
Room sizeSquare footage and how many fixtures come out.
FinishesMortar-bed tile and a cast iron tub take longer than sheet goods and acrylic.
Bins and tippingOne 10 yard bin for most bathrooms.
Minimum charge[Kam confirms a small-job minimum]

The number comes from a site walk. Small rooms with mortar-bed tile and cast iron tubs take longer than the square footage suggests; a minimum charge applies. [Kam confirms.]

Bathroom demolition questions from Pickering

One day for most bathrooms. Mortar-bed tile and a cast iron tub can push it into a second morning.

Not for the strip-out. The new plumbing and electrical work will need one from the City of Pickering; we cap the lines and leave the rerouting to the plumber.

Yes. Lots near the water can fall under conservation authority regulation, which affects the replacement house more than the demolition. Sort that with your designer before we file the permit.

Quote a Pickering bathroom demolition from a site walk.

Book a site walkGet a quote