08 · Burlington, Halton Region

Commercial demolition in Burlington

Commercial demolition runs on the landlord's calendar and the fit-out crew's start date, so the schedule is the first thing we quote. Tear-downs by the lake, split-level wall removals and basement and kitchen strip-outs elsewhere.

Commercial demolition · Burlington

Burlington, on the ground.

Burlington's Roseland, Shoreacres and Aldershot streets are 1950s and 1960s tear-downs; the newer areas up toward Dundas get renovated inside. That is where the strip-outs, the after-hours work and the occasional small-building tear-down come from. Deep southern lots take a full excavator; escarpment lots can carry conservation rules on grading and trees. Partitions, ceilings, flooring and millwork come out sorted, metal studs and ceiling tile go to recycling, and the base building is protected on the way through.

Read more about demolition in Burlington or the full commercial demolition service page.

What is included

On the ticket.

01

Strip-out to base building: partitions, ceilings, flooring, millwork, fixtures, non-structural walls

02

After-hours and weekend crews where the building requires it

03

Fire alarm, sprinkler and HVAC isolation coordinated with building operations

04

Full tear-downs of small commercial and light industrial buildings, foundation out

05

Designated-substances survey and abatement coordination on older buildings

06

Sorted loads: metal studs, ceiling tile, concrete and clean wood diverted from landfill

Permits in Burlington

Paper first.

A strip-out to base building usually needs no demolition permit, but structural removal needs a permit and an engineer, and a whole building needs a municipal demolition permit. The City of Burlington issues the permit; escarpment-area properties can need approvals beyond the City's. [Kam confirms.]

  • A strip-out to base building usually needs no demolition permit, but the fit-out that follows needs a building permit and the landlord's approval.
  • Any structural removal needs a building permit and an engineer's drawing.
  • Taking a commercial building to the ground needs a municipal demolition permit and utility disconnects. [n] weeks typical, Kam confirms.
  • Buildings from before 1990 need a designated-substances survey before work starts (O. Reg. 278/05). Older commercial buildings often have asbestos in floor tile, pipe insulation and fireproofing.

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Burlington
DriverWhat we look at
ScopeStrip-out to base building, structural work, or the whole building to the ground.
Floor areaSquare footage on the drawings.
Landlord requirementsLoading windows, protection and after-hours work set by the tenant manual.
Bins and tippingBin count by weight over the job.
After-hours premium[Kam confirms]

Commercial jobs are quoted from drawings and a site walk; landlord requirements, after-hours work and hazardous materials are priced separately.

Commercial demolition questions from Burlington

Yes. Occupied plazas and office buildings usually mean night or weekend crews, coordinated with building operations for loading and fire system isolation.

the City of Burlington. A strip-out to base building usually needs none; the fit-out that follows needs a building permit and the landlord's sign-off.

Yes. Deep lots, full excavator, foundation out and the lot graded. The City of Burlington issues the permit and we file it.

Quote a Burlington commercial demolition from a site walk.

Book a site walkGet a quote