08 · Toronto, City of Toronto

Commercial demolition in Toronto

Toronto's stock runs from 1890s brick semis downtown to 1950s bungalows at the edges, and almost none of it has a wide side yard. That is where the strip-outs, the after-hours work and the occasional small-building tear-down come from. Commercial demolition runs on the landlord's calendar and the fit-out crew's start date, so the schedule is the first thing we quote.

Commercial demolition · Toronto

Toronto, on the ground.

In Toronto we mostly gut kitchens and basements ahead of a renovation, cut out load-bearing walls for open plans, and take down garages for laneway houses. Partitions, ceilings, flooring and millwork come out sorted, metal studs and ceiling tile go to recycling, and the base building is protected on the way through.

Read more about demolition in Toronto or the full commercial demolition service page.

What is included

On the ticket.

01

Strip-out to base building: partitions, ceilings, flooring, millwork, fixtures, non-structural walls

02

After-hours and weekend crews where the building requires it

03

Fire alarm, sprinkler and HVAC isolation coordinated with building operations

04

Full tear-downs of small commercial and light industrial buildings, foundation out

05

Designated-substances survey and abatement coordination on older buildings

06

Sorted loads: metal studs, ceiling tile, concrete and clean wood diverted from landfill

Permits in Toronto

Paper first.

A strip-out to base building usually needs no demolition permit, but structural removal needs a permit and an engineer, and a whole building needs a municipal demolition permit. Toronto Building issues the permit, and residential tear-downs go through the City's demolition control process, so having the replacement building permit ready shortens the wait.

  • A strip-out to base building usually needs no demolition permit, but the fit-out that follows needs a building permit and the landlord's approval.
  • Any structural removal needs a building permit and an engineer's drawing.
  • Taking a commercial building to the ground needs a municipal demolition permit and utility disconnects. [n] weeks typical, Kam confirms.
  • Buildings from before 1990 need a designated-substances survey before work starts (O. Reg. 278/05). Older commercial buildings often have asbestos in floor tile, pipe insulation and fireproofing.

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Toronto
DriverWhat we look at
ScopeStrip-out to base building, structural work, or the whole building to the ground.
Floor areaSquare footage on the drawings.
Landlord requirementsLoading windows, protection and after-hours work set by the tenant manual.
Bins and tippingBin count by weight over the job.
After-hours premium[Kam confirms]

Commercial jobs are quoted from drawings and a site walk; landlord requirements, after-hours work and hazardous materials are priced separately.

Commercial demolition questions from Toronto

Yes. Occupied plazas and office buildings usually mean night or weekend crews, coordinated with building operations for loading and fire system isolation.

the City of Toronto (Toronto Building). A strip-out to base building usually needs none; the fit-out that follows needs a building permit and the landlord's sign-off.

Yes, with a street occupation permit from the City of Toronto. On a driveway or in a laneway you skip the permit. [Kam confirms who applies and how far ahead.]