07 · Aurora, York Region

Garage demolition in Aurora

Aurora's Yonge Street core is century houses on deep lots; the subdivisions from the 1980s onward have large unfinished basements. That shapes how we get a machine to the garage, or whether it is a hand job with the bin at the road. A detached garage comes down in a morning. The slab takes the afternoon. The permit takes longer than both.

Garage demolition · Aurora

Aurora, on the ground.

Basement and kitchen strip-outs in the subdivisions, careful gut-outs downtown, and lot clearing on the estate pockets. Roof, walls and doors are loaded the same day, the slab is broken and hauled if it is going, and the ground is raked level.

Read more about demolition in Aurora or the full garage demolition service page.

What is included

On the ticket.

01

Demolition permit filed with the municipality by us

02

Hydro to the garage disconnected before the first cut

03

Roof, walls and doors down and loaded the same day

04

Slab broken and hauled, or left in place, your call

05

Lot-line walls and neighbouring fences protected

06

Ground raked level, debris out, site swept

Permits in Aurora

Paper first.

A garage is a building, so it needs a municipal demolition permit and a dead hydro feed before it comes down. The Town of Aurora issues the permit; York Region is the upper tier.

  • A garage is a structure, so taking it down needs a demolition permit from the municipality. We file it.
  • If the garage has hydro, the feed is disconnected by a licensed electrician before demolition.
  • Attached garages are structural work where the shared wall or roof ties into the house; the engineer's drawing governs.
  • Pre-1990 garages: check for asbestos siding or roofing before demolition (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Aurora
DriverWhat we look at
How it is builtA block garage with a thick slab sits at the top; a wood-frame garage with the slab left sits at the bottom.
Slab out or leftBreaking and hauling the slab is its own line.
Bins and tippingOne 20 yard bin covers most single garages.
Permit and utility locatesWhether the municipality wants a permit and whether power runs to the garage.

The number comes from a site walk. [Kam confirms a garage-specific band.]

Garage demolition questions from Aurora

Yes. the Town of Aurora issues the demolition permit because a garage is a structure. We file it as part of the job.

Yes. If a new garage, a laneway house or a deck is going in, the slab comes out so the footings get clean ground. If you want a parking pad, a sound slab can stay.

Same week on nearly every job. [Kam confirms lead time for Aurora.]

Quote a Aurora garage demolition from a site walk.

Book a site walkGet a quote