Garage demolition in Scarborough

A detached garage comes down in a morning. The slab takes the afternoon. The permit takes longer than both. We see bungalow tear-downs for two-storey rebuilds, basement gut-outs for second suites, and a steady run of kitchens.

Garage demolition · Scarborough

Scarborough, on the ground.

Scarborough is mostly 1950s to 1970s bungalows and side-splits on 40 to 50 foot lots, nearly all old enough to need a designated-substances survey. That shapes how we get a machine to the garage, or whether it is a hand job with the bin at the road. Driveways are wide enough for the bin and a mini-excavator, so less rubble gets carried by hand than in the old city. Roof, walls and doors are loaded the same day, the slab is broken and hauled if it is going, and the ground is raked level.

Read more about demolition in Scarborough or the full garage demolition service page.

What is included

On the ticket.

01

Demolition permit filed with the municipality by us

02

Hydro to the garage disconnected before the first cut

03

Roof, walls and doors down and loaded the same day

04

Slab broken and hauled, or left in place, your call

05

Lot-line walls and neighbouring fences protected

06

Ground raked level, debris out, site swept

Permits in Scarborough

Paper first.

A garage is a building, so it needs a municipal demolition permit and a dead hydro feed before it comes down. Permits come from Toronto Building; Scarborough has had no separate permit office since amalgamation in 1998.

  • A garage is a structure, so taking it down needs a demolition permit from the municipality. We file it.
  • If the garage has hydro, the feed is disconnected by a licensed electrician before demolition.
  • Attached garages are structural work where the shared wall or roof ties into the house; the engineer's drawing governs.
  • Pre-1990 garages: check for asbestos siding or roofing before demolition (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Scarborough
DriverWhat we look at
How it is builtA block garage with a thick slab sits at the top; a wood-frame garage with the slab left sits at the bottom.
Slab out or leftBreaking and hauling the slab is its own line.
Bins and tippingOne 20 yard bin covers most single garages.
Permit and utility locatesWhether the municipality wants a permit and whether power runs to the garage.

The number comes from a site walk. [Kam confirms a garage-specific band.]

Garage demolition questions from Scarborough

Yes. the City of Toronto (Toronto Building) issues the demolition permit because a garage is a structure. We file it as part of the job.

Yes. If a new garage, a laneway house or a deck is going in, the slab comes out so the footings get clean ground. If you want a parking pad, a sound slab can stay.

The City of Toronto. Scarborough has been inside the City since 1998, so the application goes to Toronto Building.