House demolition in Oshawa

South and central Oshawa is 1920s to 1950s worker housing with plaster and lath; the north end is 1990s and 2000s subdivisions. That decides the machine we send, how many bins we stage, and whether a designated-substances survey comes before anything else. A house comes down in a day once the paperwork is done: permit filed, utilities dead, survey cleared. The paperwork is the part that takes weeks.

House demolition · Oshawa

Oshawa, on the ground.

Gut-outs for multi-unit conversions, infill tear-downs and standard basement and kitchen work in the newer areas. The excavator drops the structure into its own footprint, the foundation comes out, and the hole is backfilled and compacted so the builder gets a graded lot.

Read more about demolition in Oshawa or the full house demolition service page.

What is included

On the ticket.

01

Demolition permit filed with the municipality by us

02

Designated-substances survey arranged on pre-1990 houses; abatement before demolition if anything is found

03

Gas, hydro and water disconnects by licensed trades, Ontario One Call locates before the dig

04

Neighbouring walls, fences and protected trees fenced or braced before the machine moves

05

Structure down, foundation and footings out, hole backfilled and compacted in lifts

06

Concrete crushed, metal sorted, wood chipped; lot graded and swept

Permits in Oshawa

Paper first.

Every house demolition needs a municipal demolition permit before the building comes down, plus utility disconnects and Ontario One Call locates. The City of Oshawa issues the permit; Durham Region is the upper tier.

  • Every house demolition needs a municipal demolition permit before the building comes down. We file it. [n] weeks typical, Kam confirms.
  • In Toronto, residential demolitions go through the City's demolition control process, which considers what replaces the house.
  • Pre-1990 houses: a designated-substances survey comes first (O. Reg. 278/05 for asbestos).
  • Gas, hydro and water are disconnected by licensed trades and Ontario One Call locates are done before the first dig.

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Oshawa
DriverWhat we look at
Floor area and storeysFootprint, height and how the house is built: brick, frame, or a semi with a shared wall.
Foundation and backfillWhat the foundation is made of and how much fill the hole takes.
Disconnects and surveyGas, hydro and water isolated by licensed trades; a designated-substances survey on pre-1990 houses.
Bins and tippingBin count by weight over the whole job.
Permit and utility locatesWhether we pull the demolition permit and book the locates.

The number comes from a site walk. The survey, any abatement and engineering are quoted separately after the walk. A semi with a shared wall prices higher than a detached house of the same size.

House demolition questions from Oshawa

A day for the structure, the rest of the week for the foundation and backfill on a typical lot. The permit from the City of Oshawa and the utility disconnects run ahead of that. [Kam confirms typical timing.]

It depends on the size and storeys of the house, how it is built, the foundation, the disconnects, the bin count and whether we pull the permit and locates. The site walk sets the number; we put it in writing the same week.

Yes. A single house or a pair coming down for a new build. The City of Oshawa issues the permit; we file it and book the disconnects.

Quote a Oshawa house demolition from a site walk.

Book a site walkGet a quote