Kitchen demolition in North York

North York's 1950s bungalows on 50 foot lots have been coming down for new two-storeys for two decades, especially around Willowdale and Bayview. That tells us whether we are lifting tile on a mortar bed, pulling plaster, or stripping drywall that comes off in sheets. A kitchen is a day of demolition and a month of finishing, so the day has to leave the room exactly the way the new kitchen needs it.

Kitchen demolition · North York

North York, on the ground.

Full tear-downs for rebuilds lead the work here, followed by basement strip-outs and structural openings in the houses that stay. Water and power are isolated by licensed trades, the room is contained, and cabinets, counters, flooring and soffits leave through a protected route to the bin.

Read more about demolition in North York or the full kitchen demolition service page.

What is included

On the ticket.

01

Dust walls at every opening; return-air grilles sealed

02

Water and gas isolated by licensed trades; circuits made safe by an electrician

03

Cabinets, counters, backsplash, appliances and fixtures out

04

Flooring and underlayment lifted; subfloor left flat or removed to joists, your call

05

Soffits, bulkheads and drywall down where the design needs it

06

Rough-ins marked and protected; floors swept; photos at handover

Permits in North York

Paper first.

Stripping a kitchen to the studs is non-structural and usually needs no permit; the new kitchen's plumbing and electrical, and any load-bearing wall, do. Toronto Building issues the permit; the builder's replacement building permit usually runs alongside the demolition application.

  • Stripping a kitchen to the studs is non-structural and usually needs no permit. The new kitchen's plumbing and electrical work will need one.
  • Opening the wall to the next room is structural if it carries load: permit, engineer's drawing and temporary shoring.
  • Pre-1990 houses: floor tile, mastic and plaster can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in North York
DriverWhat we look at
Floor areaSquare footage of the kitchen and any soffits and closets that go with it.
FinishesTile on a mortar bed and plaster walls take longer than drywall and sheet flooring.
Bins and tippingOne 10 or 20 yard bin for most kitchens.
Load-bearing wall outAdds structural work, shoring and an engineer's drawing.

The number comes from a site walk. Tile on mortar bed, plaster walls and a load-bearing wall removal move it up.

Kitchen demolition questions from North York

One day for most kitchens, two if the floor comes out to the joists or a wall is opening to the next room.

Yes. If it carries load, it comes out under temporary shoring with an engineer's drawing and a permit from the City of Toronto (Toronto Building). If it does not, it is part of the strip-out.

If the City's tree bylaw protects them, we have to, and we fence them before the machine moves. Tell us at the site walk which trees you want kept.