09 · Whitchurch-Stouffville, York Region

Kitchen demolition in Whitchurch-Stouffville

New subdivision driveways hold a bin with no street permit; rural lots have room for a full excavator. Water and power are isolated by licensed trades, the room is contained, and cabinets, counters, flooring and soffits leave through a protected route to the bin. A kitchen is a day of demolition and a month of finishing, so the day has to leave the room exactly the way the new kitchen needs it.

Kitchen demolition · Stouffville

Whitchurch-Stouffville, on the ground.

Stouffville's subdivisions from the 2000s onward have unfinished basements and drywall construction; the Whitchurch side is rural houses and barns on the moraine. That tells us whether we are lifting tile on a mortar bed, pulling plaster, or stripping drywall that comes off in sheets. Basement and kitchen strip-outs in town, barn removals and tear-downs on the concession roads.

Read more about demolition in Whitchurch-Stouffville or the full kitchen demolition service page.

What is included

On the ticket.

01

Dust walls at every opening; return-air grilles sealed

02

Water and gas isolated by licensed trades; circuits made safe by an electrician

03

Cabinets, counters, backsplash, appliances and fixtures out

04

Flooring and underlayment lifted; subfloor left flat or removed to joists, your call

05

Soffits, bulkheads and drywall down where the design needs it

06

Rough-ins marked and protected; floors swept; photos at handover

Permits in Whitchurch-Stouffville

Paper first.

Stripping a kitchen to the studs is non-structural and usually needs no permit; the new kitchen's plumbing and electrical, and any load-bearing wall, do. The Town of Whitchurch-Stouffville issues the permit; York Region is the upper tier.

  • Stripping a kitchen to the studs is non-structural and usually needs no permit. The new kitchen's plumbing and electrical work will need one.
  • Opening the wall to the next room is structural if it carries load: permit, engineer's drawing and temporary shoring.
  • Pre-1990 houses: floor tile, mastic and plaster can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Whitchurch-Stouffville
DriverWhat we look at
Floor areaSquare footage of the kitchen and any soffits and closets that go with it.
FinishesTile on a mortar bed and plaster walls take longer than drywall and sheet flooring.
Bins and tippingOne 10 or 20 yard bin for most kitchens.
Load-bearing wall outAdds structural work, shoring and an engineer's drawing.

The number comes from a site walk. Tile on mortar bed, plaster walls and a load-bearing wall removal move it up.

Kitchen demolition questions from Stouffville

One day for most kitchens, two if the floor comes out to the joists or a wall is opening to the next room.

Yes. If it carries load, it comes out under temporary shoring with an engineer's drawing and a permit from the Town of Whitchurch-Stouffville. If it does not, it is part of the strip-out.

Yes, the whole town including the concession roads north of Stouffville. [Kam confirms travel time and any charge.]

Quote a Stouffville kitchen demolition from a site walk.

Book a site walkGet a quote