10 · Milton, Halton Region

Bathroom demolition in Milton

Subdivision driveways hold a bin without a street permit and the side yards take a compact machine. Plumbing is capped by a licensed trade, the door is sealed, and tile, tub, vanity and fixtures leave through a protected hallway to a 10 yard bin. A bathroom is the heaviest room in the house per square foot, and all of it goes down the stairs by hand.

Bathroom demolition · Milton

Milton, on the ground.

Milton is mostly post-2001 houses with unfinished basements and drywall construction, plus a small century core around Main Street. That tells us whether to expect mortar-bed tile and cast iron, or a 1990s acrylic surround that comes out in an hour. Basement and kitchen strip-outs are nearly all of the Milton work, with rural tear-downs and barns toward the escarpment.

Read more about demolition in Milton or the full bathroom demolition service page.

What is included

On the ticket.

01

Water isolated and plumbing capped by a licensed plumber; circuits made safe

02

Dust containment at the door; hallway and stairs protected

03

Tile, tub or shower, vanity, toilet, fixtures and accessories out

04

Walls and ceiling to the studs where the design needs it

05

Floor tile and underlayment lifted; subfloor inspected and reported

06

Debris carried out, bin loaded, room swept; photos at handover

Permits in Milton

Paper first.

A bathroom strip-out usually needs no permit; the new plumbing and electrical do, under the plumber's and electrician's permits. The Town of Milton issues the permit; escarpment lots can involve the Niagara Escarpment Commission. [Kam confirms.]

  • Stripping a bathroom is non-structural and usually needs no permit. The plumbing and electrical work in the new bathroom will need one.
  • Moving a drain or a vent stack is plumbing work under permit; we cap in place and leave the rerouting to the plumber.
  • Pre-1990 houses: floor tile, mastic and plaster can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Milton
DriverWhat we look at
Room sizeSquare footage and how many fixtures come out.
FinishesMortar-bed tile and a cast iron tub take longer than sheet goods and acrylic.
Bins and tippingOne 10 yard bin for most bathrooms.
Minimum charge[Kam confirms a small-job minimum]

The number comes from a site walk. Small rooms with mortar-bed tile and cast iron tubs take longer than the square footage suggests; a minimum charge applies. [Kam confirms.]

Bathroom demolition questions from Milton

One day for most bathrooms. Mortar-bed tile and a cast iron tub can push it into a second morning.

Not for the strip-out. The new plumbing and electrical work will need one from the Town of Milton; we cap the lines and leave the rerouting to the plumber.

Yes on nearly every subdivision lot, with protection under it. Street bins need a Town permit. [Kam confirms who applies.]

Quote a Milton bathroom demolition from a site walk.

Book a site walkGet a quote