10 · Newmarket, York Region

Bathroom demolition in Newmarket

A bathroom is the heaviest room in the house per square foot, and all of it goes down the stairs by hand. Newmarket's 1970s to 2000s subdivisions hold thousands of basements finished once badly and waiting to be done properly; the old town by Fairy Lake is century houses. That tells us whether to expect mortar-bed tile and cast iron, or a 1990s acrylic surround that comes out in an hour.

Bathroom demolition · Newmarket

Newmarket, on the ground.

Subdivision driveways hold a bin; Main Street lots sometimes need a street bin under a Town permit. Plumbing is capped by a licensed trade, the door is sealed, and tile, tub, vanity and fixtures leave through a protected hallway to a 10 yard bin.

Read more about demolition in Newmarket or the full bathroom demolition service page.

What is included

On the ticket.

01

Water isolated and plumbing capped by a licensed plumber; circuits made safe

02

Dust containment at the door; hallway and stairs protected

03

Tile, tub or shower, vanity, toilet, fixtures and accessories out

04

Walls and ceiling to the studs where the design needs it

05

Floor tile and underlayment lifted; subfloor inspected and reported

06

Debris carried out, bin loaded, room swept; photos at handover

Permits in Newmarket

Paper first.

A bathroom strip-out usually needs no permit; the new plumbing and electrical do, under the plumber's and electrician's permits. The Town of Newmarket issues the permit; York Region is the upper tier.

  • Stripping a bathroom is non-structural and usually needs no permit. The plumbing and electrical work in the new bathroom will need one.
  • Moving a drain or a vent stack is plumbing work under permit; we cap in place and leave the rerouting to the plumber.
  • Pre-1990 houses: floor tile, mastic and plaster can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Newmarket
DriverWhat we look at
Room sizeSquare footage and how many fixtures come out.
FinishesMortar-bed tile and a cast iron tub take longer than sheet goods and acrylic.
Bins and tippingOne 10 yard bin for most bathrooms.
Minimum charge[Kam confirms a small-job minimum]

The number comes from a site walk. Small rooms with mortar-bed tile and cast iron tubs take longer than the square footage suggests; a minimum charge applies. [Kam confirms.]

Bathroom demolition questions from Newmarket

One day for most bathrooms. Mortar-bed tile and a cast iron tub can push it into a second morning.

Not for the strip-out. The new plumbing and electrical work will need one from the Town of Newmarket; we cap the lines and leave the rerouting to the plumber.

On most subdivision lots, yes. Downtown, sometimes the street, under a Town permit. [Kam confirms who applies.]

Quote a Newmarket bathroom demolition from a site walk.

Book a site walkGet a quote