A detached garage comes down in a morning. The slab takes the afternoon. The permit takes longer than both. Basement and kitchen strip-outs in the subdivisions, additions in the old cores, barn removals in the country.

Garage demolition · Halton Hills

Halton Hills, on the ground.

Georgetown and Acton have century cores and 1980s to 2000s subdivisions, with farms and barns on the concession roads between them. That shapes how we get a machine to the garage, or whether it is a hand job with the bin at the road. Deep downtown lots take a compact machine to the back; rural lots take anything; the drive from the yard is the long part. Roof, walls and doors are loaded the same day, the slab is broken and hauled if it is going, and the ground is raked level.

Read more about demolition in Halton Hills or the full garage demolition service page.

What is included

On the ticket.

01

Demolition permit filed with the municipality by us

02

Hydro to the garage disconnected before the first cut

03

Roof, walls and doors down and loaded the same day

04

Slab broken and hauled, or left in place, your call

05

Lot-line walls and neighbouring fences protected

06

Ground raked level, debris out, site swept

Permits in Halton Hills

Paper first.

A garage is a building, so it needs a municipal demolition permit and a dead hydro feed before it comes down. The Town of Halton Hills issues the permit; escarpment-area lots can need approvals beyond the Town's. [Kam confirms.]

  • A garage is a structure, so taking it down needs a demolition permit from the municipality. We file it.
  • If the garage has hydro, the feed is disconnected by a licensed electrician before demolition.
  • Attached garages are structural work where the shared wall or roof ties into the house; the engineer's drawing governs.
  • Pre-1990 garages: check for asbestos siding or roofing before demolition (O. Reg. 278/05).

The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.

What sets the price in Halton Hills
DriverWhat we look at
How it is builtA block garage with a thick slab sits at the top; a wood-frame garage with the slab left sits at the bottom.
Slab out or leftBreaking and hauling the slab is its own line.
Bins and tippingOne 20 yard bin covers most single garages.
Permit and utility locatesWhether the municipality wants a permit and whether power runs to the garage.

The number comes from a site walk. [Kam confirms a garage-specific band.]

Garage demolition questions from Halton Hills

Yes. the Town of Halton Hills issues the demolition permit because a garage is a structure. We file it as part of the job.

Yes. If a new garage, a laneway house or a deck is going in, the slab comes out so the footings get clean ground. If you want a parking pad, a sound slab can stay.

Yes. Properties inside the Niagara Escarpment Plan area may need approvals beyond the Town's; we flag it at the site walk. [Kam confirms.]