Bathroom demolition in Vaughan
A bathroom is the heaviest room in the house per square foot, and all of it goes down the stairs by hand. Vaughan splits between Woodbridge and Thornhill tear-down streets from the 1970s and 1980s and newer Maple and Vellore Village subdivisions that get renovated inside. That tells us whether to expect mortar-bed tile and cast iron, or a 1990s acrylic surround that comes out in an hour.
Vaughan, on the ground.
Estate lots in Kleinburg take any machine we own; the newer subdivisions have wide driveways that hold a bin. Plumbing is capped by a licensed trade, the door is sealed, and tile, tub, vanity and fixtures leave through a protected hallway to a 10 yard bin.
Read more about demolition in Vaughan or the full bathroom demolition service page.
On the ticket.
Water isolated and plumbing capped by a licensed plumber; circuits made safe
Dust containment at the door; hallway and stairs protected
Tile, tub or shower, vanity, toilet, fixtures and accessories out
Walls and ceiling to the studs where the design needs it
Floor tile and underlayment lifted; subfloor inspected and reported
Debris carried out, bin loaded, room swept; photos at handover
Paper first.
A bathroom strip-out usually needs no permit; the new plumbing and electrical do, under the plumber's and electrician's permits. The City of Vaughan issues the permit, and in-ground pools on the same lot need their own application.
- Stripping a bathroom is non-structural and usually needs no permit. The plumbing and electrical work in the new bathroom will need one.
- Moving a drain or a vent stack is plumbing work under permit; we cap in place and leave the rerouting to the plumber.
- Pre-1990 houses: floor tile, mastic and plaster can contain asbestos. A designated-substances survey comes first (O. Reg. 278/05).
The plates on every truck: WSIB, insurance, demolition permits, asbestos survey, utility locates, crew training.
| Driver | What we look at |
|---|---|
| Room size | Square footage and how many fixtures come out. |
| Finishes | Mortar-bed tile and a cast iron tub take longer than sheet goods and acrylic. |
| Bins and tipping | One 10 yard bin for most bathrooms. |
| Minimum charge | [Kam confirms a small-job minimum] |
The number comes from a site walk. Small rooms with mortar-bed tile and cast iron tubs take longer than the square footage suggests; a minimum charge applies. [Kam confirms.]
One day for most bathrooms. Mortar-bed tile and a cast iron tub can push it into a second morning.
Not for the strip-out. The new plumbing and electrical work will need one from the City of Vaughan; we cap the lines and leave the rerouting to the plumber.
Yes. We sequence it so the pool is drained and broken before the house comes down, and the outbuildings go last so the machine has a clear path. One permit application covers the structures; the pool needs its own. [Kam confirms in-ground pool scope.]
